- Completed placing based course on Banas Drive.
- Completed placing asphalt on Banas Drive, except at the intersections connecting into the existing
- JRCC instructed Maple Leaf and WSP to adhere to the RM of Brokenhead Municipal Standards for asphalt testing
- JRCC conducted visual inspection of asphalt placement.
- WSP took asphalt samples for Marshall Testing.
- Approximately 800 tonnes of asphalt.