  • Completed placing based course on Banas Drive.
  • Completed placing asphalt on Banas Drive, except at the intersections connecting into the existing
  • JRCC instructed Maple Leaf and WSP to adhere to the RM of Brokenhead Municipal Standards for asphalt testing
  • JRCC conducted visual inspection of asphalt placement.
  • WSP took asphalt samples for Marshall Testing.
  • Approximately 800 tonnes of asphalt.